Production Enhancement Procedure
Supervisor(s):
Dr. Mohy Mansour
Team
Members:
Khaled Abd El-Razek
Rauof Abo El-Khier
Hatem El-Tabbakh
Mohamed Sallam
Hani Shehata
Objectives:
Produce an aiding tool to recognize and solve facilities problems to generate an
efficient plant facility, thus increase productivity through:
Detailed constraint analysis, aggregate planning and safety
analysis for the chosen plant.
Propose solutions for existing problems
Test feasibility of some proposed solutions from thesis 1
Apply Drum-Buffer-Rope principal which is logistical system with a finite
scheduling mechanism that contracts and balances the flow of the system.
Optimize MSCO material handling device
Develop an efficient re-engineering of MSCO's current facility plant.
Develop a PEP manual
Achievements:
1) Manuals
" PEP flow chart"
" Objective, scope, limitation"
2) Implement some of the proposed solutions in theses 1, which lead to increase
in productivity and elimination of existing problems and thus increasing profit.